EDocuments Request for Quote
Your contract number or project reference number
The name of your customers organisation
Approx Build cost including external works costs. Please deduct MEP services works costs.
Approximate date if exact date is unknown.
e.g. Retail, Residential, Commercial Office, Healthcare, Industrial, Entertainment, Transport, Mixed use etc
The name of the Services Contractor
Approx MEP and Specialist Services costs.
There is an upload section at the end of this form to enable information to be attached.
Products and Services Required
Handover Information
The standard set of Handover Information comprises of a single set of documents per project including certificates, drawings and models if applicable and as detailed in this link.
If the project has multi-tenanted buildings, separate buildings, multiple developers or landlords, then separate discrete sets of Handover Information maybe required. This means that each set may have different suppliers, systems, products, review and delivery processes. These are not additional copies of the same information and will need to created, managed and costed as separate sets of Handover Information.
Note: Separate Residential Units (e.g. 200 Apartments) are part of the single Handover Information Set where Apartment User Guides will be provided. Typically each Apartment Type (e.g. Type A, B, will have a User Guide.
Please add the products that you require.
Add Entry
If the project is to be delivered as phases, areas, or buildings then it is likely you will need multiple sets of handover information which will determine the set up of the system.
Features
Outputs
Onboarding
​
To manage the delivery of the Handover Information as detailed below
What does the Project Management Services comprise?
If this project has any BIM L2, COBie, data validation or similar requirements then we have some further services.
Data Transfer - O&M asset data (type/component) pushed back to the Revit model object element properties creating an Edocuments prefix
Revit/Navis model objects with O&M asset data as above.
Springboard link between model objects in viewer and asset data in O&M Manual. Annual hosting license required .
Please add any notes related to the project.
In addition to the standard user guide do you require the above.
All printing is outsourced as we no longer have nay in house print capability. If you require a cost for this please contact us at least 4 weeks prior to required delivery date.
Technical Authoring for MEP Services Sub-contractor
Authoring of specialist services typically MEP manuals on behalf of the sub-contractor:
Single upload of final certificates and as built drawings issued via transmittal notices from project CDE.
Collate and manage the review process for the fire safety information to BS8644 or customers specific requirements
Hosting of all Handover Information on Springboard our data management platform.
Ongoing hosting option for End Users after defects liability period. This can also include updating services for models, data and O&M manuals. From £ 25 pcm per user per project/site.
An additional module to Springboard to manage the assets within the O&M Manuals and models. From £ 40 pcm per user per project/site.
Creating interactive data links between panorama's / 2D images to O&M assets.
Is there anything else you would like to request or tell us about the project.
Please upload all relevant information if available : Employers Information Requirement BIM Execution Plan Specifications Schedules Drawings