Energy Code Proposal Form

Contact Information

Required
(If Different)

Property Information

Compliance Path Descriptions

Is the property under contract? When do you break ground?

Project Specifications and Details

These details are necessary for performance and ERI compliance pathways.

For future reference when working with the same model
Direction the front entry door faces
Direction the front entry door faces
Select a wall frame configuration
Select an Insulation Material
Select the proposed framed wall R-Value
What type of foundation wall
Describe insulation material at foundation walls
What is the R-value of the basement wall insulation
Predominant U-value and SHGC
Include furnace type, fuel, size and proposed efficiency
Include air conditioner type, size and proposed efficiency
Include water heater type, fuel, distribution and size
Single-line Name Email Phone upload Description